Inicio  /  Buildings  /  Vol: 3 Núm: 3 Par: Septemb (2013)  /  Artículo
ARTÍCULO
TITULO

Approaches to Delay Claims Assessment Employed in the UK Construction Industry

 Artículos similares

       
 
Mohammadreza Habibi, Sharareh Kermanshachi and Behzad Rouhanizadeh    
Delay and cost overrun in construction projects are two widespread problems that arouse practitioners? and scholars? concern. Therefore, the objective of this study was to identify Key Performance Indicators (KPIs) in each of Engineering, Procurement and... ver más
Revista: Infrastructures

 
Juan Camilo Paz, David Rozenboim, Álvaro Cuadros, Sandra Cano, John Escobar     Pág. 41 - 69
This paper tackles the problem of scheduling construction projects considering the influence of delay risks. In the actual body of knowledge, several methods have been proposed to handle this problem, starting from the Project Evaluation and Review Techn... ver más

 
Sofia Anna Menesidou, Vasilios Katos and Georgios Kambourakis    
Since their appearance at the dawn of the second millennium, Delay or Disruption Tolerant Networks (DTNs) have gradually evolved, spurring the development of a variety of methods and protocols for making them more secure and resilient. In this context, p... ver más
Revista: Future Internet

 
Baris Baspinar, Emre Koyuncu, Gokhan Inalhan     Pág. 499 - 508
This work aims to build different types of data-driven approaches in modeling European ATM Network Flow to capture the behavior of delay propagation over the network. To build proper network models and set their parameters, we have utilized historical fl... ver más

 
Samara Soares Leal, Paulo Eduardo Maciel de Almeida, Edward Chung     Pág. 1769 - 1780
The growth of vehicles? fleet circulating on urban streets constitutes a very strong tendency in recent years. The main consequence of this phenomenon refers to the increase of urban congestions, of average delays caused by vehicles waiting on traffic li... ver más