8   Artículos

« Anterior     Página: 1 de 1     Siguiente »

 
en línea
Julia Lange and Frank Werner    
The job shop scheduling problem with blocking constraints and total tardiness minimization represents a challenging combinatorial optimization problem of high relevance in production planning and logistics. Since general-purpose solution approaches strug... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Cheol Min Joo and Byung Soo Kim    
This article addresses an integrated problem of one batching and two scheduling decisions between a manufacturing plant and multi-delivery sites. In this problem, two scheduling problems and one batching problem must be simultaneously determined. In the ... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Angela Maria Nino Navarrete, Juan Pablo Caballero Villalobos     Pág. 51 - 58
AbstractDownloadsReferencesHow to Cite
Revista: Ingeniería    Formato: Electrónico

 
en línea
Mario César Vélez Gallego, Juan Diego López Jiménez    
En este artículo se presentan los resultados de una investigación desarrollada para resolver el problema de programación de producción, en un sistema en el cual el objetivo principal es cumplir con las fechas de entrega. Cada trabajo está descrito por su... ver más
Revista: Revista Ingeniería Industrial    Formato: Electrónico

 
en línea
Samuel Nucamendi-Guillén, Diego Flores-Díaz, Elias Olivares-Benitez and Abraham Mendoza    
This paper studies the Cumulative Capacitated Vehicle Routing Problem, including Priority Indexes, a variant of the classical Capacitated Vehicle Routing Problem, which serves the customers according to a certain level of preference. This problem can be ... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Shenquan Huang, Ya-Chih Tsai and Fuh-Der Chou    
This paper considers the single-machine problem with job release times and flexible preventive maintenance activities to minimize total weighted tardiness, a complicated scheduling problem for which many algorithms have been proposed in the literature. H... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
BongJoo Jeong, Jun-Hee Han and Ju-Yong Lee    
This study considers a scheduling problem for a flow shop with urgent jobs and limited waiting times. The urgent jobs and limited waiting times are major considerations for scheduling in semiconductor manufacturing systems. The objective function is to m... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Lanfen Liu and Xinfeng Yang    
Due to the influence of insufficient production capacity or shortage of production materials, production enterprises may produce products in advance or be backordered. In order to improve the adaptability of enterprises and reduce production costs, the i... ver más
Revista: Algorithms    Formato: Electrónico

« Anterior     Página: 1 de 1     Siguiente »