66   Artículos

 
en línea
Yu-Hung Chang, Chien-Hung Liu and Shingchern D. You    
The dynamic flexible job-shop problem (DFJSP) is a realistic and challenging problem that many production plants face. As the product line becomes more complex, the machines may suddenly break down or resume service, so we need a dynamic scheduling frame... ver más
Revista: Information    Formato: Electrónico

 
en línea
Lei Sun, Weimin Shi, Junru Wang, Huimin Mao, Jiajia Tu and Luojun Wang    
Production scheduling in a knitting workshop is an important method to improve production efficiency, reduce costs and improve service. In order to achieve a reasonable allocation of parallel machines as well as cooperation between different machines wit... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Levente Fazekas, Boldizsár Tüu-Szabó, László T. Kóczy, Olivér Hornyák and Károly Nehéz    
Flow-shop scheduling problems are classic examples of multi-resource and multi-operation scheduling problems where the objective is to minimize the makespan. Because of the high complexity and intractability of the problem, apart from some exceptional ca... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Toufik Mzili, Ilyass Mzili, Mohammed Essaid Riffi and Gaurav Dhiman    
This paper presents a new hybrid algorithm that combines genetic algorithms (GAs) and the optimizing spotted hyena algorithm (SHOA) to solve the production shop scheduling problem. The proposed GA-SHOA algorithm incorporates genetic operators, such as un... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Paolo Renna, Sergio Materi and Michele Ambrico    
Cellular manufacturing systems are widely used due to their advantageous capability of combining the flexibility of the job-shop and the productivity of the flow-shop. In recent years, the reduction of the product life cycle, variation in demand products... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Haida Zhang and Wensi Ding    
In this paper, we research the dynamic car sequencing problem with car body buffer (DCSPwB) in automotive mixed-flow assembly. The objective is to reorder the sequence of cars in the paint shop using the post-painted body buffers to minimize the violatio... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Chang-Bae Gil and Jee-Hyong Lee    
Manufacturing sites encounter various scheduling problems, which must be dealt with to efficiently manufacture products and reduce costs. With the development of smart factory technology, many elements at manufacturing sites have become unmanned and more... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Christoph Laroque, Madlene Leißau, Pedro Copado, Christin Schumacher, Javier Panadero and Angel A. Juan    
Based on a real-world application in the semiconductor industry, this article models and discusses a hybrid flow shop problem with time dependencies and priority constraints. The analyzed problem considers a production where a large number of heterogeneo... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Milos Seda    
The assignment problem is a problem that takes many forms in optimization and graph theory, and by changing some of the constraints or interpreting them differently and adding other constraints, it can be converted to routing, distribution, and schedulin... ver más
Revista: Algorithms    Formato: Electrónico

 
en línea
Danial Rooyani and Fantahun Defersha    
The work in this paper is motivated by a recently published article in which the authors developed an efficient two-stage genetic algorithm for a comprehensive model of a flexible job-shop scheduling problem (FJSP). In this paper, we extend the applicati... ver más
Revista: Algorithms    Formato: Electrónico

« Anterior     Página: 1 de 4     Siguiente »