102   Artículos

 
en línea
Mazen A. Al-Sinan, Abdulaziz A. Bubshait and Zainab Aljaroudi    
Recent advancements in machine learning (ML) applications have set the stage for the development of autonomous construction project scheduling systems. This study presents a blueprint to demonstrate how construction project schedules can be generated aut... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Jianying Wei, Yuming Liu, Xiaochun Lu, Yu Feng and Yadi Wang    
Tunnel construction projects are a classic type of repetitive project, and hold a crucial position in the construction industry. The linear scheduling method (LSM) has been in the spotlight in scheduling optimization for repetitive construction projects ... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Edyta Plebankiewicz and Patrycja Karcinska    
The paper presents a model that aims to support the construction contractor in the process of construction workforce planning by verifying initial assumptions about the planned number of man-hours, determined using a widely available and widely used meth... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Raghad Almashhour, Haneen Abuzaid and Sameh El-Sayegh    
The construction industry is a dynamic and ever-evolving sector, continuously adapting to societal needs. Within this context, project managers play a pivotal role in steering projects from inception to completion. This study delves into the vital dimens... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Shalaka Hire, Sayali Sandbhor and Kirti Ruikar    
With developments in Industry 4.0, there is growing momentum to adopt technology-assisted tools to support existing processes. Even though most construction processes are now computerized, safety procedures have not yet fully embraced the digital revolut... ver más
Revista: Buildings    Formato: Electrónico

 
en línea
Shichang Xiao, Jinshan Huang, Hongtao Hu and Yuxin Gu    
Automatic guided vehicles (AGVs) in the horizontal area play a crucial role in determining the operational efficiency of automated container terminals (ACTs). To improve the operational efficiency of an ACT, it is essential to decrease the impact of batt... ver más
Revista: Journal of Marine Science and Engineering    Formato: Electrónico

 
en línea
Huang Feng and Yu Zhang    
Extensive research in predicting annual passenger throughput has been conducted, aiming at providing decision support for airport construction, aircraft procurement, resource management, flight scheduling, etc. However, how airport operational throughput... ver más
Revista: Aerospace    Formato: Electrónico

 
en línea
Chanwoo Lee, Minsu Cha, Hyeonmin Kim and Hunhee Cho    
Earthwork scheduling (during the planning phase of road construction) is an important task that directly affects the cost and time of a project. However, the current scheduling methods are not performed at a detailed level and carry forward gaps from the... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Ze Yu, Chuxin Wang, Yuanyuan Zhao, Zhiyuan Hu and Yuanjie Tang    
The linear scheduling method (LSM) for optimization in linear projects has been the focus of numerous academic studies over the years. However, research on incorporating reverse construction activities and other practical scenarios, such as flexible acti... ver más
Revista: Applied Sciences    Formato: Electrónico

 
en línea
Armin Rashidi Nasab, Hassan Malekitabar, Hazem Elzarka, Ala Nekouvaght Tak and Khashayar Ghorab    
Addressing safety risks in construction is an ongoing priority, and integrating safety considerations into construction scheduling is a crucial aspect of this effort. A notable challenge is the safety risk posed by concurrent tasks, which has received li... ver más
Revista: Buildings    Formato: Electrónico

« Anterior     Página: 1 de 6     Siguiente »